ASSESSMENT THE SAFETY POLICY MANAGEMENT FOR BUILDING CONSTRUCTION COMPANIES IN JORDAN

  • Faidhi Abdulrahman Salman Alubaid ISRA University - Amman - Jordan

Abstract


In Jordan the building construction industry is considered to be one of the most significant industries in terms of contributing to economy, and also in terms of its impact on health and safety of the working people. Construction industry is so important for both sides the socially and economically. At the same time, the construction industry, is also known to be the most hazardous. Therefor it is essential to investigate and assess the factors effecting safety policy of building construction companies in Jordan, and identifying the level of attention in applying the safety related factors. This research identifies seven of these factors that have the greatest impact to arise.  Subsequently, a questionnaire survey was presented into 64 question. The questionnaire survey was distributed to 179 (1st, 2nd and 3rd degree) companies which provided by Jordanian construction contractors association. Statistical analysis was carried out to 145 responding companies by employing the (SPSS) program. Data related to safety policy management were analyzed and discussed in details.

References

Mohamed A.J. Improving Safety Management System for Building Construction Projects in Jordan. MSc. Thesis, Isra University, Amman, Jordan; 2014.

El-Mashaleh M.S, Al-Smadi B.M, Hyari K H & Rababeh S.M. Safety Management in the Jordanian Construction Industry. Jordan J. of Civil Engineering 2010; Vol.4, No.1: 47- 54.

Senouci A, Al-Abbadi I & Eldina N. Safety Improvement on Building Construction Sites in Qatar. Creative Construction Conference 2015; Procedia Eng. 123: 504- 509.

Al Haadir S & Panuwatwanich K. Critical Success Factors for Safety Program Implementation among Construction Companies in Saudi Arabia. The Twelfth East Asia-Pacific Conference on Structural Engineering and Construction 2011; Procedia Eng. 14: 148- 155.

Zolfagharian S, Ressang A, Irizarry J, Nourbakhsh M & Zin R.M. Risk Assessment of Common Construction Hazards among Different Countries. Sixth International Conference on Construction in the 21st Century 2011; Kuala Lumpur, Malaysia: 151- 160.

El-nagar R, Hosny H & Askar H.S. Development of a Safety Performance Index for Construction Projects in Egypt. American Journal of Civil Engineering and Architecture 2015; Vol.3, No.5: 182-192.

Hasan A & Jha K.N. Safety incentive and penalty provisions in Indian construction projects and their impact on safety performance. International J. of Injury Control and Safety Promotion 2013; Vol.20, Issue 1: 3- 12.

Aksorn T & Hadikusumo B.H.W. Critical success factors influencing safety program performance in Thai construction projects. Safety Science J. 2008; Vol.46, Issue 4: 709–727.

Nord H, Wiitavaara B, H6gberg H & Westerling R. A cross-sectional study of factors influencing occupational health and safety management practices in companies. Safety Science J. 2017; Vol.95: 95-103.

Chen Y, McCabe B & Hyatt D. Impact of individual resilience and safety climate on safety performance and psychological stress of construction workers: A case study of the Ontario construction industry. Journal of Safety Research 2017; Vol.61: 167- 176.

Sunindijoa R.Y. Improving safety among small organizations in the construction

industry: key barriers and improvement strategies. The 5th International Conference of Euro Asia Civil Engineering Forum 2015; Procedia Engineering 125: 109- 116.

Ozmec M.N, Karlsen I.L, Kines P, Andersen L.P.S & Nielsen K.J. Negotiating safety practice in small construction companies. Safety Science J. 2015; Vol.71: 275- 281.

Ayessaki W.Y & Smallwood J. Influencing Workers' Performance through Health and Safety Interventions. 7th International Conference on Engineering, Project, and Production Management 2017; Procedia Engineering 182: 42- 49.

Endroyo B, Surajib A & Besaric M.S. Model of the maturity of pre-construction safety planning. Sustainable Civil Engineering Structures and Construction Materials 2017; Procedia Engineering 171: 413- 418.

Israel G.D. Program Evaluation and Organizational Development, Institute of Food and Agricultural Sciences (IFAS) 2009. Department of Agricultural Education and Communication, and extension specialist, University of Florida, Gainesville 32611.

George D. & Mallery P. SPSS for windows step by step, A sample Guide & Reference, (Fourth Edition) 2003; Allyn & Bacon Publication, Canada, P231.

MacMillan A., Preston D., Wolfe J. & Yu S. Basic statistics: mean, median, average, standard deviation, z-scores, and p-value 2006; SCRIBD, P28.

Iyer, K.C. & Jha, K.N. Factors Affecting Cost Performance, Evidence from Indian Construction Projects. International J. of Project Management 2005; Vol. 23, Issue 4: 283–295.

Published
2020/03/12
Section
Original Scientific Paper