CRANE CABINS WITH INTEGRATED VISUAL SYSTEMS FOR THE DETECTION AND INTERPRETATION OF ENVIRONMENT - ECONOMIC APPRAISAL

  • Nikola Dondur Prof. dr Nikola Dondur Univerzitet u Beogradu, Mašinski Fakultet
  • Vesna Spasojević-Brkić Doc. dr Vesna Spasojević-Brkić Univerzitet u Beogradu, Mašinski Fakultet
  • Aleksandar Brkić Univerzitet u Beogradu, Mašinski Fakultet
Keywords: operator, products, integrity, economic feasibility, cranes, cabin,

Abstract


This paper analyses the economic feasibility of production and use of the new generation crane cabins of considerably lighter weight and stiff structure whose interior space necessary for the operator will be developed by using the methods of physical, cognitive and organizational ergonomics with the solved problem of visibility and which will allow higher productivity due to reduction of physical and psychological stress of the operator, as well as greater safety and security due to the integrated visual system. It is proved that the total economic benefit of the exploitation of the cabin in the overall exploitation period is significantly higher than the purchase price of the cabin, as well as that the internal rate of return is above the relevant average weighted interest rate and the payback period is less than three years. The analysed project of production and use of crane cabins with integrated visual systems for the detection and interpretation of environment is the  project with  low economic risk.

Key words: Economic feasibility, crane cabin..

References

Beavers J. E., Moore J. R., Rinehart R., Schriver W. R., (2006), Crane-Related Fatalities in the Construction Industry, Journal of Construction Engineering and Management, Vol. 132, No. 9, , pp. 901-910.

Curry, S. And Weiss, J. (2000). Project Analysis in Developing Countries, MacMillan Press. London.

Dobrojević, M., Rakin, M., Međo, B., Omić, S., Sedmak, A. (2010). Internet application for project management in industrial systems. Journal of Applied Engineering Science (Istraživanja i projektovanja za privredu), no. 28, pp. 73-82

Dondur, N., (2002). Economic Analysis of Projects, Faculty of Mechanical Engineering, Belgrade (in Serbian).

Global Cranes, Lifting and Handling Equipment - Market Opportunities and Business Environment, Analyses and Forecasts to 2015, World Market Intelligence,(March2011). (http://www.researchandmarkets.com/reports/1579090/global_cranes_lifting_and_handling_equipment)

Neitzel, R. L., Seixas, N. S., and Ren, K. K., (2001), A review of crane safety in the construction industry, Appl. Occup. Environ. Hyg., Vol. 16 No.12, pp. 1106–1117.

Potts, D. (2002). Project Planning and Analysis for Development, Lynne Rienner Publishers, Inc. London.

Rosenfeld, Y. and Shapira, A. (1998). Automation of existing tower cranes: economic and technological feasibility, Automation in Construction, vol. 7. pp. 285-298.

Published
2012/12/25
Section
Professional Paper