THE INFLUENCE OF EXPEDITED FABRICATION RATE, UNRELIABLE MACHINES, SCRAP, AND REWORK ON THE PRODUCTION RUNTIME DECISION IN A VENDOR-BUYER COORDINATED ENVIRONMENT

  • Yuan-Shyi Peter Chiu Ramapo College of New Jersey, Anisfield School of Business, Mahwah, USA
  • Yunsen Wang Southwestern University of Finance and Economics, School of Accounting, Chengdu, China
  • Tiffany Chiu Rutgers Business School, Department of Accounting and Information Systems, Newark, USA
  • Peng-Cheng Sung Chaoyang University of Technology, Department of Industrial Engineering & Management, Taichung, Taiwan https://orcid.org/0000-0002-8892-1685
Keywords: production management, unreliable machine, expedited fabrication rate, rework, scrap, multi-shipment

Abstract


Transnational manufacturing firms operate in highly competitive marketplaces. This means that they are continuously seeking ways to reduce order response and fabrication cycle times, maintain the desired product quality, manage unanticipated machine failures, and provide timely delivery to effectively minimize overall operating cost and maintain a competitive advantage over their intra-supply chains. To assist firms in achieving these operational goals, we examine a buyer-vendor coordinated system with an expedited fabrication rate, unreliable machines, scrap, and rework, with the objective of minimizing the overall operating costs. An imperfect manufacturing process is assumed, which arbitrarily produces repairable and scrap items, with the latter being reworked in each fabrication cycle. Additionally, the process is subject to a Poisson-distributed machine breakdown. The corrective action is undertaken immediately when the machine fails, and the production of unfinished/interrupted lot resumes when the process is restored. The expedited fabrication rate option is used at an extra cost to reduce the cycle length. We built a fabrication-shipment model to characterize the problem’s features explicitly. Mathematical and optimization approaches assist us in determining the optimal fabrication runtime policy. A numerical example illustrates the capability/applicability of our outcomes. Furthermore, it exposes a diverse set of information relating to the collective/individual effect of differences in the expedited rates, mean-time-to-breakdown, frequency of shipment, and rework/disposal rates of defective items on the optimal policy, utilization, total operating cost, and various cost contributors. This information can contribute to facilitating better decision-making.

References

Gershwin, S.B. (1987). Representation and analysis of transfer lines with machines that have different processing rates. Annals of Operations Research, 9(1), 511–530. DOI: 10.1007/BF02054752

Makino, H., Tominaga, M. (1995). Estimation of production rate in flexible assembly systems. CIRP Annals of Manufacturing Technology, 44(1), 7–10. DOI: 10.1016/S0007-8506(07)62263-X

Freiheit, T., Shpitalni, M., Hu, S.J., Koren, Y. (2004). Productivity of synchronized serial production lines with flexible reserve capacity. International Journal of Production Research, 42(10), 2009-2027. DOI: 10.1081/00207540310001647596

Singh, S.R., Sharma, S. (2013). An integrated model with variable production and demand rate under inflation. Procedia Technology, 10, 381–391. DOI: 10.1016/j.protcy.2013.12.374

Chiu, S.W., Wu, C-S., Tseng, C-T. (2019). Incorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system. Operations Research Perspectives, 6, 1-12, art. no. 100115. DOI: 10.1016/j.orp.2019.100115

Chiu, Y.-S.P., Chen, H.-Y., Chiu, S.W., Chiu, V. (2018). Optimization of an economic production quantity-based system with random scrap and adjustable production rate. Journal of Applied Engineering Science, vol. 16, br. 1, str. 11-18. DOI: 10.5937/jaes16-15458

Ameen, W., AlKahtani, M., Mohammed, M.K., Abdulhameed, O., El-Tamimi, A.M. (2018). Investigation of the effect of buffer storage capacity and repair rate on production line efficiency. Journal of King Saud University - Engineering Sciences, 30(3), 243-249. DOI: 10.1016/j.jksues.2018.03.001

Chiu, S.W., Huang, Y-J., Chiu, Y-S.P., Chiu, T. (2019). Satisfying multiproduct demand with a FPR-based inventory system featuring expedited rate and scraps. International Journal of Industrial Engineering Computations, 10(3), 443-452. DOI: 10.5267/j.ijiec.2018.11.001

Demić, M., Rakićević, B., Jovanović, M., Miličić, B. (2020). Research into truck transmission torsion vibrations under longitudinal acceleration. Journal of Applied Engineering Science, vol. 18, br. 2, str. 243-250. DOI: 10.5937/jaes18-23164

Moinzadeh, K., Lee, H.L. (1987). A continuous˗review inventory model with constant resupply time and defective items. Naval Research Logistics, 34(4), 457-467. DOI: 10.1002/1520-6750(198708)34:43.0.CO;2-O

Hong, Y., Glassey, C.R., Seong, D. (1992). The analysis of a production line with unreliable machines and random processing times. IIE Transactions, 24(1), 77-83. DOI: 10.1080/07408179208964201

Geren, N., Lo, E.K. (1998). Equipment selection, integration and interfacing of a robotic PCBA component rework cell. Computer Integrated Manufacturing Systems, 11(1-2), 77-89. DOI: 10.1016/S0951-5240(98)00014-7

Kyriakidis, E., Dimitrakos, T. (2006). Optimal preventive maintenance of a production system with an intermediate buffer. European Journal of Operational Research, 168, 86–99. DOI: 10.1016/j.ejor.2004.01.052

Widyadana, G.A., Wee, H.M. (2012). An economic production quantity model for deteriorating items with multiple production setups and rework. International Journal Production Economics, 138(1), 62-67. DOI: 10.1016/j.ijpe.2012.02.025

Nasr, W.W., Salameh, M., Moussawi-Haidar, L. (2017). Economic production quantity with maintenance interruptions under random and correlated yields. International Journal of Production Research, 55(16), 4544-4556. DOI: 10.1080/00207543.2016.1265684

Zhao, X., Qian, C., Nakamura, S., Nakagawa, T. (2018). A summary of replacement policies with number of failures. International Journal of Mathematical, Engineering and Management Sciences, 3(2), 136-150. DOI: 10.33889/IJMEMS.2018.3.2-011

de Vasconcelos, V., Soares, W.A., da Costa, A.C.L., Raso, A.L. (2019). Use of reliability block diagram and fault tree techniques in reliability analysis of emergency diesel generators of nuclear power plants. International Journal of Mathematical, Engineering and Management Sciences, 4(4), 814-823. DOI: 10.33889/IJMEMS.2019.4.4-064

Zammori, F., Bertolini, M., Mezzogori, D. (2020). A constructive algorithm to maximize the useful life of a mechanical system subjected to ageing, with non-resuppliable spares parts. International Journal of Industrial Engineering Computations, 11(1), 17-34. DOI: 10.5267/j.ijiec.2019.7.001

Gabitov, I., Insafuddinov, S., Ivanov, Y., Yunusbaev, N., Abdrazakov, F., Farhutdinov, T. (2020). Examination of the system of continuous diagnosis and forecasting of mechanical condition of tractors and other farm machinery. Journal of Applied Engineering Science, vol. 18, br. 1, str. 70-80. DOI: 10.5937/jaes18-22568

Aderohunmu, R., Mobolurin, A., Bryson, N. (1995). Joint vendor-buyer policy in JIT manufacturing. Journal of the Operational Research Society, 46(3), 375-385. DOI: 10.2307/2584331

Thomas D.J., Hackman S.T. (2003). A committed delivery strategy with fixed frequency and quantity. European Journal of Operational Research, 148(2), 363-373. DOI: 10.1016/S0377-2217(02)00398-3

Shaw, D.K., Mishra, A., Khan, D.A. (2012). An integrated inventory model for single vendor multi customer scenario with multiple shipments in a supply chain. International Journal of Mathematical, Engineering and Management Sciences, 7(2), 140-146. DOI: 10.1080/17509653.2012.10671217

Urrea, C., Pascal, J. (2018). Algorithms for the generation of autonomous routes. Journal of Applied Research and Technology, 16(5), 373-383. DOI: 10.22201/icat.16656423.2018.16.5.740

Batukhtin, A., Batukhtina, I., Bass, M., Batukhtin, S., Kobylkin, M., Baranovskaya, M., Baranovskaya, A. (2019). Development and experimental verification of the mathematical model of thermal inertia for a branched heat supply system. Journal of Applied Engineering Science, vol. 17, br. 3, str. 413-424. DOI: 10.5937/jaes17-22408

López-Ruíz, S., Carmona-Benítez, R.B. (2019). The design of a liquefied natural gas (LNG) distribution network of a company operating in Mexico. Journal of Applied Research and Technology, 17(4), 213-249. DOI: 10.22201/icat.16656423.2019.17.4.818

Chiu, S.W., Lin, J-N., Wang, Y., Lin, H-D. (2020). Mathematical modeling for multiproduct EPQ problem featuring delayed differentiation, expedited rate, and scrap. International Journal for Engineering Modelling, 33(3-4), 75-95. DOI:10.31534/engmod.2020.3-4.ri.05v

Singamsetty, P., Thenepalle, J.K. (2021). Designing optimal route for the distribution chain of a rural LPG delivery system. International Journal of Industrial Engineering Computations, 12(2), 221-234. DOI: 10.5267/j.ijiec.2020.11.001

Published
2021/04/13
Section
Original Scientific Paper