Project scheduling method with time using MRP system - A case study: Construction project in Libya

  • Abdallah Ali Imetieg Singidunum University
  • Miroslav Lutovac Singidunum University

Sažetak


Materials Requirements and Planning (MRP) is a system of production planning and inventory control, which is used to manage manufacturing processes. Most MRP systems are software-based and are used to ensure that the materials are available for production, that the products are available for delivery to customers, that the lowest possible material and product level is maintained in store, as well as to plan delivery schedules and purchasing activities. Upon completion of scheduling, begins the process of follow-up, which includes the achievement of the project goals in terms of quantity, quality and costs in accordance with deadlines. MRP system was applied to project of 5000 housing units in Solug area, which is close to Benghazi city, Libya, with the aim to provide necessary cash flow to pay dues on time without delay to all involved project sub-contractors and material suppliers, to ensure the smooth flow of operations, as well as to diminish costs by reduction of temporary storages and rented areas. There is a correlation between time and cost of each activity.  If the required time is shorter than the scheduled time of the certain activity, it would demand more resources, which further leads to the increase in direct costs of the given activity. Therefore, the output of MRP is important since commands are issued through planning in order to launch the suggested orders with the required quantities and within the limited time period.

Reference

Fernandes, F.C.F., & Filho, M.G. (2011). Production control systems: Literature review, classification, and insights regarding practical application. African Journal of Business Management. 5 (14), 5573-5582.

Gomes da Silva, G., Maia, C.A. (2014). On just-in-time control of timed event graphs with input constraints: a semimodule approach. Discrete Event Dynamic Systems. doi: 10.1007/s10626-014-0200-z

Jodlbauer, H., & Reitner, S. (2012). Material and capacity requirements planning with dynamic lead times. International Journal of Production Research, 50(16), 4477-4492. doi: 10.1080/00207543.2011.603707

Jonsson, P., & Mattsson, S.A. (2009). Manufacturing, planning and control. New York: McGraw-Hill Higher Education.

Kassim, N. (2004). Application of MRP1 System in the Libyan Public Company for Manufacturing Investments. Journal of Economic Research Benghazi, 15(1), 456.

Khatib, S.M. (2008). The impact of the potential application of the planning system resource requirements to control inventories. MBA, Faculty of Management and Economics, University of Baghdad – Iraq, p. 37

Kim, K. (2014). Material Resource Planning (MRP): Will You Need MRP without the Customer? Open Journal of Social Sciences, 2(4), 1-5. doi: 10.4236/jss.2014.24027

Landry, S., & Beaulieu M. (2013). The Challenges of Hospital Supply Chain Management, from Central Stores to Nursing Units, In B. T. Denton (Ed.) Handbook of healthcare operations management: Methods and applications. New York, NY: Springer.

Mula, J., Poler, R., Garcia-Sabater, J.P., & Lario, F.C. (2006). Models for production planning under uncertainty: A review. International Journal of Production Economics, 103 (1), 271-285. doi: 10.1016/j.ijpe.2005.09.001

Obeidi, A.I.H.A. (2007). Adoption of the MRP system in organizational performance improvement using a balanced scorecard technology BSC-Master technology operations - Management Technical College- Baghdad - Technical Education.

O'Grady, P.J. (2012). Putting the Just-In-Time Philosophy into Practice: A Strategy for Production Managers. New York: Springer Science & Business Media.

Panizzolo, R., & Garengo, P. (2013). Using Theory of Constraints to Control Manufacturing Systems: A Conceptual Model. Industrial Engineering and Management, 3(3), 1-9. doi: 10.4172/2169-0316.1000111

Parsaei, H.R., Sullivan, W.G., & Hanley, T.R. (2013). Economic and Financial Justification of Advanced Manufacturing Technologies. Amsterdam: Elsevier.

Powell, D., Alfnes, E., & Strandhagen, J.O., & Dreyer, H. (2012). The concurrent application of lean production and ERP: Towards an ERP-based lean implementation process. Computers in Industry, 64(3), 324–335.

Ptak, C., & Smith, C. (2011). Orlicky's Material Requirements Planning. New York: McGraw-Hill.

Ram, B., Naghshineh-Pour, M.R., & Yu, X. (2006). Material requirements planning with flexible bills-of-material. International Journal of Production Research, 44(2), 399-415. doi: 10.1080/00207540500251505

Rom, W.O., Tukel, O.I., & Muscatello, J.R. (2002). MRP in a job shop environment using a resource constrained project scheduling model. Omega, 30(4), 276. doi: 10.1016/S0305-0483(02)00033-6

Sarkar, B., Gupta, H., Chaudhuri, K., & Goyal, S.K. (2014). An integrated inventory model with variable lead time, defective units and delay in payments. Applied Mathematics and Computation, 237, 650-658. doi: 10.1016/j.amc.2014.03.061

Segerstedt, A. (1998). Cover-Time Planning: A Less Complex Alternative to MRP. Advanced Models and Methods for Production Planning. Berlin: Springer. doi: 10.1007/978-3-662-03742-3_3

Wincel, J.P., & Kull, T.J. (2013). People, Process, and Culture: Lean Manufacturing in the Real World. London: CRC Press.

Zaher, H., & Zaki, T.T. (2014). Optimal Control Theory to Solve Production Inventory System in Supply Chain Management. Journal of Mathematics Research, 6(4), 109-117. doi: 10.5539/jmr.v6n4p109

Zoraghia, N., Najafib, A.A., & Niaki, S.T.A. (2014). Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches. International Journal of Engineering.

Objavljeno
2015/04/30
Broj časopisa
Rubrika
Originalni naučni članak