Customer order decoupling point issues in a project environment
Sažetak
Nowadays, one of the most dynamically developing knowledge areas is the one of Project Management (PM) – both in the fields of Business and Public Administration. This is truth, partially because of constantly increasing customization of products and services, and the way to successfully cope with fulfilling customer orders, no matter if they are individual, industrial, or government ones. The key is the usage of Project Management tools and methods. On the other hand, the concept of Customer Order Decoupling Point (CODP) is a popular approach to increasing the diversity of end items, while taking advantage of standardization due to increased repetitiveness of operations devoted to producing components and/or subassemblies. It is widely used in Operations Management, but it could also be applied on a “secondary” level during the process of project implementation, and thus an increased customer customization could be achieved. In the present paper, the usage of methods and techniques such as Design Structure Matrix (DSM), Analytical Hierarchy Process (AHP) and others is discussed in a model developing, which helps in defining places throughout the project implementation process the interaction with the customer is to be realized, while avoiding undesirable violations in the project workflow.
Reference
Andreev, O. (2006). Project management. Sofia: Softtrade (in Bulgarian).
Andreev, O. (2009). Modern production and operations management systems: A concept for achieving lean mass customization. Sofia: Softtrade (in Bulgarian).
Browning, T., & Eppinger, S. (2002). Modeling impacts of process architecture on cost and schedule risk in product development. IEEE Transactions on Engineering Management, 49(4): 428-442.
Damyanov, D., & Panayotova, T. (2007). Organizing concurrent engineering in industrial enterprises. Varna: TU-Varna publishing (in Bulgarian).
Eppinger, S., Whitney, D., Smith, R., & Gebada, D. (1994). A model-based method for organizing tasks in product development. Research in Engineering Design, 6: 1-13.
Feitzinger, E., & Lee, H. (1997). Mass customization at Hewlett Packard: the power of postponement. Harvard Business Review, 75: 116-121.
Gupta, D., & Benjaafar, S. (2004). Make-to-order, make-to-stock, or delay product differentiation? A common framework for modeling and analysis. IIE Transactions, 36: 529-546.
Hughes, T. (2010). When the enterprise becomes the prosumerise. Retrieved May 2011, from http://www.widality.com
McCord, K., & Eppinger, S. (1993). Managing the integration problem in concurrent engineering. M.I.T. Sloan School of Management, Cambridge, MA, Working Paper no.3594.
Olhager, J. Strategic positioning of the order penetration point. Retrieved February 2011, from http://www.renard2kanak.eu/documents/Supply_Chain_Managment_-_Readings_-_Strategic_Positioning_-_A200.pdf
Pine II, B. (1992). Mass customization: The new frontier in business competition. Harvard Business School.
Panayotova, T. (2005). Organizational connections modeling in complex reengineering projects, Dissertation thesis. Sofia (in Bulgarian).
Panayotova, T., & Andreev, O. (2011). Defining permissible customer penetration zone in managing complex projects. Conference Proceedings, III International Scientific Conference in e-Governance 2011 – Sozopol, Bulgaria, 112-120 (in Bulgarian).
Prahalad, C., & Ramaswamy, V. (2004). The future of competition: Co-creating unique value with customers. Harvard Business School Press.
Saaty, Т. (1980). The analytical hierarchy process. New York: McGraw Hill.
Steward, D. (1981). The design structure system: A method for managing the design of complex systems. IEEE Transactions on Engineering Management, 28: 71-74.
Swaminathan, J., & Tayur, S. (1999). Managing design of assembly sequences for product lines that delay product differentiation. IIE Transactions, 31: 1015-1027.
Van Donk, D. (2001). Make to stock or make to order: The decoupling point in the food processing industries. International Journal of Production Economics, 69: 297-306.
The Author wishes to submit the Work to SJM for publication. To enable SJM to publish the Work and to give effect to the parties’ intention set forth herein, they have agreed to cede the first right to publication and republication in the SJM Journal.
Cession
The Author hereby cedes to SJM, who accepts the cession, to the copyright in and to the paper.
The purpose of the cession is to enable SJM to publish the Work, as first publisher world-wide, and for republication in the SJM Journal, and to grant the right to others to publish the Work world-wide, for so long as such copyright subsists;
SJM shall be entitled to edit the work before publication, as it deems fit, subject to the Authors approval
The Author warrants to SJM that:
- the Author is the owner of the copyright in the Work, whether as author or as reassigned from the Author’s employee and that the Author is entitled to cede the copyright to SJM;
- the paper (or any of its part) is not submitted or accepted for publication in any other Journal;
- the Work is an original work created by the Author;
- the Author has not transferred, ceded, or assigned the copyright, or any part thereof, to any third party; or granted any third party a licence or other right to the copyright, which may affect or detract from the rights granted to SJM in terms of this agreement.
The Author hereby indemnifies the SJM as a body and its individual members, to the fullest extent permitted in law, against all or any claims which may arise consequent to the warranties set forth.
No monetary consideration shall be payable by SJM to the Author for the cession, but SJM shall clearly identify the Author as having produced the Work and ensure that due recognition is given to the Author in any publication of the Work.
Should SJM, in its sole discretion, elect not to publish the Work within 1 year after the date of this agreement, the cession shall lapse and be of no further effect. In such event the copyright shall revert to the Author and SJM shall not publish the Work, or any part thereof, without the Author’s prior written consent.